Prices vary by site, surface grade and location. Every quote is issued after a free site assessment — we never commit to a price without seeing the site.
Capsinfra Catalogue
15 catalogues available
Every Project Includes
No hidden costs after
the quote is issued.
Free site assessment before any commitment
Detailed BOQ and fixed-price quote within 5 days
Certified surface materials (BWF / ITF / FIFA / FIBA / BCCI / WSF)
International-standard line marking
10-year structural warranty on full complexes
Test certificates on handover
Quoted Separately
What we quote
as separate line items.
GST (billed additionally on final invoice)
Electrical works and sports lighting supply
Site clearance and demolition of existing surface
Spectator seating and scoring boards
Irrigation systems (cricket grounds)
Pricing FAQ
Common questions about cost.
Why do you show per-sqft pricing instead of a fixed price?
Court construction cost depends on the actual site: dimensions, sub-base condition, drainage, access, and location. Per-sqft pricing gives you a meaningful starting point. After our engineer visits, we issue a fixed-price quote — no hidden costs.
How accurate is the indicative pricing?
Within 15–20% before site assessment. After our free site visit, we issue a fixed quote that we hold to — no mid-project increases unless you change the scope.
Can I phase the project?
Yes. We design sub-base and drainage to accommodate future expansion. Phase 1 to Phase 2 additions are seamless if planned from the start — at no extra charge for the foundation design.
What's included in the quoted price?
Sub-base, surface supply and installation, line marking, fencing (where specified), and first-year maintenance visit. GST is additional. Electrical and lighting are quoted separately unless specified.


