capsinfra.
Get Free Court Assessment
Services|Wooden Sports Flooring Installation
Sports Infrastructure

Wooden Sports Flooring Installation

We supply and install professional wooden sports flooring for indoor courts across India. North American maple is the BWF, FIBA, and WSF preferred surface. Canadian maple for premium academies and professional venues. African teak for cost-effective club facilities. Floating sub-floor system with shock absorption and humidity protection. Every installation includes a climate control assessment — the single most important factor for wooden flooring in India.

Indicative price range

5,50,00028,00,000

Single badminton court from ₹5,50,000. ₹380–520 per sq ft installed. North American maple First Grade from ₹480/sq ft. African teak from ₹380/sq ft.

Final price after free site assessment. No hidden costs.

What's included

Built right, first time.

Every item below is included as standard — not an upgrade or add-on.

North American maple — BWF, FIBA, WSF preferred surface

Canadian maple for premium professional venues

African teak — durable cost-effective option

Floating sub-floor with shock absorption panels

Humidity and moisture barrier system

Multi-sport line marking — badminton, basketball, volleyball

Recyclable and renewable surface material

15–25 year lifespan with proper maintenance

How it works

From first call to handover.

01

Climate assessment

Wooden flooring requires year-round humidity control (45–65% RH). We assess your building's HVAC system before recommending wooden flooring. If climate control is inadequate, we recommend PU synthetic instead.

02

Species and grade selection

North American maple grades explained — First Grade for international play, Second Grade for club and academy use. Cost and performance differences shown clearly.

03

Fixed-price quote

Covers sub-floor system, moisture barrier, flooring supply and installation, sanding, finishing, and multi-sport line markings.

04

Installation

6–10 weeks depending on court count. Temperature and humidity monitored throughout installation.

05

Finishing and handover

Final sanding, court finish application, line marking, and full documentation including humidity management protocol.

Common questions

Before we start.

Start your project

Ready to build?

Send us your site details and requirements. We'll respond within 24 hours with an honest feasibility assessment.

Office

Pune, Maharashtra

Reply within 24 hours. No sales calls unless you ask.

Back to all services